Darren Tanke’s Gorgosaurus preparation 29: Turning the block over 1.

The new support jacket was labelled with the specimen number, again several times in case the number accidently gets rubbed off. Strong nylon rachet straps were put around the specimen to hold it all together. Four 1/2″ holes were drilled through the new jacket at each “corner” and down through the old field jacket underneath. I used photographs to ensure I was not drilling through bone. Heavy bolts and washers were inserted into the holes and a nut tightened on underneath. These bolts will ensure everything stays together. Then lifting straps were slid under the block in preparation for lifting and turning the block over.

2 Responses to “Darren Tanke’s Gorgosaurus preparation 29: Turning the block over 1.”


  1. 1 Mark Robinson 16/06/2011 at 3:39 am

    Fascinating stuff, Darren. Thanks.


  1. 1 Darren Tanke’s Gorgosaurus preparation: final roundup « Dave Hone's Archosaur Musings Trackback on 02/09/2012 at 8:46 pm

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




@Dave_Hone on Twitter

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 346 other followers


Follow

Get every new post delivered to your Inbox.

Join 346 other followers

%d bloggers like this: